| Main Contractor | NAEL General Contracting |
|---|---|
| MEP Contractor | M/S. Red Sea Eagle Electromechanical Contracting L.L.C |
| Scope of Works | Full HVAC works including 2 Air Cooled Chillers & AC System. |
| Key Challange | The key challenge in a variable primary chiller plant was maintaining system stability and optimal ΔT under varying load conditions, while ensuring precise coordination between chiller staging, variable-speed pumps, and control valve modulation to prevent low flow and chiller cycling. |
| Work Duration | 05-Jul-2021 to 05-Jan-2022 |
| Location | Abu Dhabi |