Construction of Air Cooled Chiller Plant + 4 stories Buildings

FULL HVAC WORKS (Completed)
Main Contractor NAEL General Contracting
MEP Contractor M/S. Red Sea Eagle Electromechanical Contracting L.L.C
Scope of Works Full HVAC works including 2 Air Cooled Chillers & AC System.
Key Challange The key challenge in a variable primary chiller plant was maintaining system stability and optimal ΔT under varying load conditions, while ensuring precise coordination between chiller staging, variable-speed pumps, and control valve modulation to prevent low flow and chiller cycling.
Work Duration 05-Jul-2021 to 05-Jan-2022
Location Abu Dhabi