ETS, Primary & Secondary UG CHW Network

ETS AND UG CHW NETWORK (Completed)
Main Contractor Force10 UAE LLC
MEP Contractor M/S. Red Sea Eagle Electromechanical Contracting L.L.C
Scope of Works ETS along with the Primary & Secondary UG Chilled Water Network
Key Challange To ensure uninterrupted cooling for critical hospital operations, a redundant system was designed integrating district cooling as the primary source with an on-site chiller plant as a backup. The system automatically switches to the chiller in case of district cooling supply failure, maintaining continuous operation and compliance with healthcare facility requirements.
Work Duration 12 Months
Location Abu Dhabi